A second prototype of the completely new control system DCU301 has been built.
The pre-tests have been completed and all boards have been successfully commissioned, now testing is in progress. Currently the input stages are measured and the internal and external communication interfaces are tested. The next steps are the detailed functional tests and a check of the EMC immunity of the prototype.
Do you like more information about the industrial converter of PTC Industry & Energy GmbH – see here:
Locations
Berlin, Germany
+49 30 297725-0
rail@powertech-converter.com
Holzkirchen, Germany
+49 8024 990-0
rail@powertech-converter.com
Mount Olive, USA
+1 973 527 6060
info.usa@powertech-converter.com